- Pays
- Ouganda
- Ville
- BULISA
- Lieu de travail
- BULISA-INDUSTRIAL AREA(UGA)
- Domaine
- Forage Puits
- Type de contrat
- CDI
- Expérience
- Minimum 15 ans
There are few equivalent projects of such an industrial drilling magnitude in a remote and sensitive area. A Green Field Project, the Tilenga field is to be found in a remote location in Uganda near lake Albert with sensitive environmental conditions.
A challenging project: circa 200 oil producer wells and 200 water injector wells; heavy and waxy oils produced and treated in a Production Center of 200,000bopd oil capacity and 650,000 bld of water treatment capacity; reservoir pressure maintenance is ensured by water injection; Oil produced through ESP (Electrical Submersible Pumps) Artificial lift means. The project also includes an extended interconnecting network with temperature preservation.
Multicultural environment: Contractors are anticipated to be located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as International codes for onshore plant will apply.
Three (3) drilling rigs drill and run the lower completion of the 420+ wells. Two (2) workover rigs are planned to be operating from first oil to maintain the well, with circa 90% of their workscope being ESP replacement on the Oil Producer wells. The first workover rig is to be mobilized before first oil to run the Oil Producers Upper Completions in the suspended wells
Main Duties and Responsibilities:
HSE:
Preparations of Operations:
Operations Follow Up:
Qualifications & Experience: