- País
- República do Uganda
- Cidade
- KAMPALA
- Local de trabalho
- KAMPALA-COURSE VIEW TWRS(UGA)
- Domínio
- Geociências & Reservatório
- Tipo de contrato
- Contrato Duração Indeterminada (CDI)
- Experiência
- Mínimo 6 anos
The Upstream part of the Lake Albert Development in Uganda consists of development of oil fields, six onshore fields (together known as ‘Tilenga’, operated by TotalEnergies) and an offshore field known as ‘Kingfisher’ operated by CNOOC. The development of Tilenga requires the drilling, in factory mode, of more than 400 wells from 31 wellpads using 3 drilling rigs. The first oil is planned in 2025-26 with a plateau of 190Kbopd. The production mechanism is water injection from the start and ESP in all the producers to maximize production and ensure cap rock integrity. A Polymer Injection Pre-Development with dedicated monitoring plan will also be deployed at first oil. A massive interwell tracer campaign and incompletion tracer is planned from the first oil date.
Main Duties and Responsibilities:
Qualifications & Experience: