- Land
- Oeganda
- Stad
- KAMPALA
- Werkplaats
- KAMPALA-COURSE VIEW TWRS(UGA)
- Domein
- Geoscience & Reservoir
- Contracttype
- Onbepaalde tijd
- Ervaring
- Minimaal 6 jaar
A Green Field Project, the Tilenga field is to be found in a remote location in UGANDA near lake Albert with particular sensitive environmental conditions. A challenging project; heavy and waxy oils produced from 31 drilling pads, (with some of them located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bld of water treatment capacity. Reservoir pressure maintenance is ensured either by water injection or by polymer water injection depending on the reservoirs characteristics. The project also includes an extended interconnecting network with temperature preservation.
Multicultural environment: Contractors are anticipated to be located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as International codes for onshore plant will apply
Main Duties and Responsibilities:
Qualifications & Experience: