- Land
- Oeganda
- Stad
- BULISA
- Werkplaats
- BULISA-INDUSTRIAL AREA(UGA)
- Werkgever bedrijf
- TotalEnergies EP Uganda
- Domein
- Operaties
- Contracttype
- Onbepaalde tijd
- Ervaring
- Minimaal 6 jaar
There is no equivalent project of such an industrial construction and drilling magnitude in a remote and sensitive area within the Company today. The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within a populated area in a rural and remote part of Uganda. Activities are exposed to the risk of major incidents with severe potential consequences due to the local environment. Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site. The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential. Multicultural environment: Contractors are located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as International codes for onshore plant will apply. The project is aiming for full FID in Q1 2022 with a start of drilling operations circa Q3 2022 and a Ready For Start-up (RFSU) target 40-45 months after FID.
Main Duties and Responsibilities:
Project Phase
Operational Phase
Activities (Safety)
Activities (M&I / Production / SIMOPS / Construction / Drilling)
Qualifications & Experience: