- País
- República de Uganda
- Ciudad
- BULISA
- Empresa empleadora
- TotalEnergies EP Uganda
- Dominio
- Industrial Projects
- Type of contract
- Contrato a tiempo indeterminado
- Experience
- Al menos 15 años
The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within densely populated area in a rural and remote part of Uganda. Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGO’s. Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site. The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential. Multicultural environment: Contractors/subcontractors are anticipated to be located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will
apply.
Main Duties and Responsibilities:
Qualifications & Experience: