- Country
- Uganda
- City
- KAMPALA
- Workplace location
- KAMPALA-COURSE VIEW TWRS(UGA)
- Employer company
- TotalEnergies EP Uganda
- Domain
- Maintenance / Inspection / Technology, Operations
- Type of contract
- Regular position
- Experience
- Minimum 15 years
There is no equivalent project of such an industrial drilling magnitude in a remote and sensitive area within the Company today. The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area,
and within densely populated area in a rural and remote part of Uganda. Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGO’s. Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site. 80 WO operation with 2 WO rigs. The project is focused on delivering the lowest possible cost, which requires challenging TotalEnergies design concepts as well as substantially challenging the TotalEnergies referential. Heavy and waxy oils will be produced from 29 well pads, (with 9 located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bwpd of water treatment capacity. Reservoir pressure maintenance is ensured by water injection, test of polymer water injection will be implemented. The project also includes an extended interconnecting network with temperature preservation. LPG extraction, storage and tankers loading facilities are part of the CPF facilities. 90 km of Feeder line with 6 block valve station facilities and Kabaler Shared Facilities are under Operational Responsibility of Field Site Manager. Multicultural environment. Highly Populated at the south of the field. Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will apply.
Main Duties and Responsibilities:
Project Phase
Operational Phase (additional to Project activities)
Qualifications & Experience: