- Land
- Republik Uganda
- Stadt
- KAMPALA
- Ort des Arbeitsplatzes
- KAMPALA-COURSE VIEW TWRS(UGA)
- Unternehmen des Arbeitgebers
- TotalEnergies EP Uganda
- Domain
- Industrial Projects
- Art des Auftrags
- Unbefristeter Vertrag
- Erfahrung
- Mindestens 10 Jahre
Green Field Project, Tilenga is a remote location in UGANDA near Albert Lake with particular sensitive environmental conditions. Huge onshore challenging project: heavy and waxy oils produced from 31 drilling pads, (with some of them located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bold of water treatment capacity. Reservoir pressure maintenance is ensured either by water injection or by polymer water injection depending on the
reservoir’s characteristics. The project also includes an extended interconnecting network with temperature preservation. Multicultural environment: Contractors are anticipated to be located in various parts of the world. Ugandan rules and
regulations, administrative requirements, and technical authorizations as well as international codes for onshore plant will apply.
Main Duties and Responsibilities:
Qualifications & Experience: