- Country
- Uganda
- City
- KAMPALA
- Workplace location
- KAMPALA-COURSE VIEW TWRS(UGA)
- Employer company
- TotalEnergies EP Uganda
- Domain
- Maintenance / Inspection / Technology, Operations
- Type of contract
- Regular position
- Experience
- Less than 3 years
There is no equivalent project of such an industrial drilling magnitude in a remote and sensitive area within the Group today. The Tilenga oilfields are partly situated in a protected National Park, partly beneath the river Nile wetlands area, and within densely populated area in a rural and remote part of Uganda. Activities exposed to the risk of major incidents with severe potential consequences due to local environment and important presence of NGO’s. Factory Drilling with a well delivered every 4 days using 3 drilling rigs simultaneously will necessitate standardization of equipment and procedures, strict enforcement of Drilling & Well instructions, safe and efficient logistic management on site. The project is focused on delivering the lowest possible cost, which requires challenging design concepts as well as substantially challenging the Company referential. Challenging production fluids (high oil viscosity on Northern Wellpads, very waxy crudes on Southern wellpads) will have to be treated through the oil production chain, which makes Tilenga project unique in terms of production chemistry, separation and PWT challenges.
Multicultural environment: Contractors will be located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as international codes for onshore plant will apply.
Main Duties and Responsibilities:
HSSE
Technical
Interfaces
Quality
Digital
Qualifications & Experience: