- Country
- Uganda
- City
- BULISA
- Workplace location
- BULISA-INDUSTRIAL AREA(UGA)
- Domain
- Industrial Projects
- Type of contract
- Regular position
- Experience
- Minimum 15 years
Green Field Project, Tilenga is a remote location in UGANDA near Albert lake with particular sensitive environmental conditions. Huge onshore challenging project; heavy and waxy oils produced from 31 drilling pads, (with some of them located
in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bld of water treatment capacity. Reservoir pressure maintenance is ensured either by water injection or by polymer water injection depending
Main Duties and Responsibilities:
Area Superintendent South and Construction Manager as required.
Qualifications & Experience: